DESCRIPTION
Power to the rear blower motor is supplied from the battery via the RR A/C relay.
The rear blower motor speed level varies between 0 and 31 based on the voltage difference measured between the terminals of the motor.
The voltage difference measured between the terminals of the rear blower motor changes in proportion to the control at the rear blower motor controller on the ground side.
WIRING DIAGRAM

INSPECTION PROCEDURE
1 READ VALUE OF INTELLIGENT TESTER
(a) Connect the intelligent tester to the DLC3.
(b) Turn the ignition switch to the ON position and turn the intelligent tester main switch on.
(c) Select the item below in the DATA LIST, and read the display on the intelligent tester.
DATA LIST / AIR CONDITIONER 
OK: The display is as specified in the normal condition.


PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
2 INSPECT REAR BLOWER MOTOR

(a) Remove the rear blower motor with the connector still connected.
(b) Disconnect the connector from the rear blower motor.
(c) Connect the positive (+) lead to terminal 1 of the rear blower motor connector, and the negative (-) lead to terminal 2.
OK: The rear blower motor operates smoothly.


3 CHECK HARNESS AND CONNECTOR (REAR BLOWER MOTOR - BATTERY)

(a) Measure the voltage according to the value(s) in the table below.
Standard voltage 


4 CHECK HARNESS AND CONNECTOR (REAR BLOWER MOTOR CONTROLLER - BODY GROUND)

(a) Disconnect the connector from the rear blower motor controller.
(b) Measure the resistance according to the value(s) in the table below.
Standard resistance 


5 CHECK HARNESS AND CONNECTOR (REAR BLOWER MOTOR - REAR BLOWER MOTOR CONTROLLER)

(a) Measure the resistance according to the value(s) in the table below.
Standard resistance 


6 CHECK HARNESS AND CONNECTOR (REAR BLOWER MOTOR CONTROLLER - A/C AMPLIFIER)

(a) Disconnect the connector from the A/C amplifier.
(b) Measure the resistance according to the value(s) in the table below.


7 INSPECT REAR BLOWER MOTOR CONTROLLER

(a) Disconnect the connector from the rear blower motor controller.
(b) Measure the resistance according to the value(s) in the table below.
Standard resistance 

(c) Connect the positive (+) lead to terminal 3 through a 12 V 3.4 W test bulb, and the negative (-) lead to terminal 1.
(d) Connect the three 1.5 V dry cell batteries' positive (+) lead to terminal 2, and the negative (-) lead to terminal 1.
Then check that the test bulb comes on.
OK: The test bulb comes on.


PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
Rear Air Conditioning Relay Circuit
IG Power Source CircuitCommunication Error from ECM to VSC
DTC P1631 Communication Error from ECM to VSC
DTC U0100 Lost Communication with ECM/PCM "A"
DESCRIPTION
The ECM sends signals such as A/T information signals, dynamic laser cruise
control operation signals,
brake operation demand signals, and buzzer operation demand signals to the sk ...
Installation
1. INSTALL WATER PUMP ASSEMBLY
(a) Install a new water pump gasket and the water
pump assembly with the 16 bolts.
Torque: Bolt A
21 N*m (214 kgf*cm, 15 ft.*lbf)
Bolts B and C
9.1 N*m (93 kgf*cm, 81 in.*lbf)
NOTICE:
Make sure that there is no oil on the threads
of bolts A.
...
Data list / active test
HINT:
By accessing the DATA LIST displayed by the intelligent
tester, you can perform such functions as reading the values
of switches and sensors without removing any parts. Reading
the DATA LIST as the first step in troubleshooting is one
method to shorten labor time.
1. DATA LIST FOR OCCUPA ...