Active test
HINT:
Performing an ACTIVE TEST enables components
including the relays, VSV (Vacuum Switching Valve), and
actuators, to be operated without removing any parts.
The ACTIVE TEST can be performed with an intelligent
tester. Performing an ACTIVE TEST in the first step in
troubleshooting is one ...
Operation check
NOTICE: Inspection should be started after conforming that
the items listed in the "CUSTOMIZE PARAMETER" for the power back door system
have defaulted to the initial settings
1. CHECK OPENING OPERATION
Conditions necessary for the power back door to
open:
Power back d ...
Installation
1. INSTALL 3 POINT TYPE NO. 2 REAR SEAT BELT ASSEMBLY
Check the degree of tilt when the belt begins to lock
the ELR.
Check that the belt does not lock within 15 of
tilt in all directions but that the belt locks with
over 45 of tilt, when gently moving the
retractor. ...