ON-VEHICLE INSPECTION
1. INSPECT ENGINE OIL PRESSURE SWITCH ASSEMBLY
Standard Resistance:
Engine stopped:
Below 1 Ω
Engine idling:
10 kΩ or higher
HINT: If the value is not as specified, replace the engine oil pressure switch.
Fuel sender gauge
assembly
Audio / visualErasing the entire HomeLink® memory (all three programs)
Press and hold down the 2 outside
buttons for 10 seconds until
the indicator light flashes.
If you sell your vehicle, be sure to
erase the programs stored in the
HomeLink® memory.
Before programming
Install a new battery in the transmitter.
The battery side of the transmitter must ...
Installation
1. INSTALL HEATED OXYGEN SENSOR (for Bank 2
Sensor 2) (See page EC-39)
2. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(a) Install a new gasket to the front exhaust pipe
assembly.
(b) Install the front exhaust pipe assembly with the 2
nuts.
Torque: 62 N*m (632 kgf*cm, 46 ft.*lbf)
3. V
V(A) ins ...
Power slide door touch sensor
INSPECTION
1. INSPECT POWER SLIDE DOOR TOUCH SENSOR LH
Check the resistance of the sensor.
Resistance
If the result is not as specified, replace the sensor.
2. INSPECT POWER SLIDE DOOR TOUCH SENSOR RH
Check the resistance of the sensor.
Resistance
If the result is not a ...