Opening and closing proceduresInstallation
1. INSTALL REAR AXLE HUB & BEARING ASSEMBLY LH
(a) Install the hub & bearing assembly LH with the 4
bolts.
Torque: 56 N*m (571 kgf*cm, 41 ft.*lbf)
2. INSPECT BEARING BACKLASH (See page AH-19)
3. INSPECT AXLE HUB DEVIATION (See page AH-19)
4. INSTALL REAR DRIVE SHAFT ASSEMBLY LH (Se ...
Precaution
1. REMOVAL AND INSTALLATION OF THE BATTERY TERMINAL
Before performing electrical work, disconnect the
battery negative (-) terminal in order to prevent a
short in the system.
When disconnecting and reconnecting the battery
cable, turn the ignition switch and lighting swit ...
Short to GND in Front Pretensioner Squib LH
Circuit
DTC B0137/71 Short to GND in Front Pretensioner Squib LH
Circuit
DESCRIPTION
The front pretensioner squib LH circuit consists of the center airbag sensor
assembly and the front seat
outer belt assembly LH.
This circuit instructs the SRS to deploy when deployment conditions are met.
DTC B ...