SST
RECOMMENDED TOOLS
EQUIPMENT
SSM
2GR-FE INTAKE
EQUIPMENT
PREPARATION 2GR-FE EXHAUST
EQUIPMENT
No Sound can be Heard from Speakers
INSPECTION PROCEDURE
1 CHECK AUDIO SETTINGS
Enter the sound adjustment screen by pressing the
"SOUND" switch on the AUDIO display.
Set volume, fader, and balance to the initial values and
check that sound is normal.
OK:
Audio system returns to normal.
HINT:
Sou ...
Evaporative Emission Control System Incorrect
Purge Flow
DTC P0441 Evaporative Emission Control System Incorrect
Purge Flow
DTC SUMMARY
DESCRIPTION
The circuit description can be found in the EVAP (Evaporative Emission)
System.
INSPECTION PROCEDURE
Refer to the EVAP System.
MONITOR DESCRIPTION
The two monitors, Key-Off and Purge Flow, are us ...
Installation
1. INSTALL ROOF HEADLINING ASSEMBLY
w/ sliding roof:
Install the roof headlining with the 5 clips.
w/o sliding roof:
Install the roof headlining with the 3 clips.
NOTICE:
In order to prevent the roof headlining from
becoming bent, work must be performed by 2 or
more persons when ...