ON-VEHICLE INSPECTION
1. INSPECT A/C PRESSURE SENSOR

(a) Install the manifold gauge set.
(b) Disconnect the connector from the A/C pressure sensor.
(c) Connect the three 1.5 V dry cell batteries' positive (+) lead to terminal 3 and the negative (-) lead to terminal 1.
(d) Connect the voltmeter's positive (+) lead to terminal 2 and the negative (-) lead to terminal 1.
(e) Measure the voltage according to the value(s) in the table below.
Standard voltage 
If the result is not as specified, replace the A/C pressure sensor.
Evaporator temperature sensor (for rear air conditioning system)
Magnetic clutch relayReadiness monitor drive
pattern
1. PURPOSE OF READINESS TESTS
The On-Board Diagnostic (OBD II) system is
designed to monitor the performance of emissionrelated
components, and indicate any detected
abnormalities with DTCs (Diagnostic Trouble Codes).
Since various components need to be monitored in
different d ...
Preparation 2gr-fe lubrication
SST
EQUIPMENT
LUBRICANT
SSM
PREPARATION 2GR-FE IGNITION
RECOMMENDED TOOLS
EQUIPMENT
2GR-FE STARTING
RECOMMENDED TOOLS
EQUIPMENT
...
Compressor and magnetic clutch
COMPONENTS
...